From: route@monster.com
Sent: Friday, August 19, 2016 10:53 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
James “Tracy” Wooley Home (979) 548.0202
307
S Hackberry
*Cell (979) 709.7589 Sweeny, Texas anitantracy@msn.com
Summary: ·
A
knowledgeable, detail-oriented professional offering my expertise in all
phases of Project / Construction Management / Planning / Scheduling / Cost
Controls in all phases of Construction ( Grass Roots, Brown Roots, Revamp,
Capital Projects, TAR’s ). ·
Manage
Projects from Engineering Estimate / Design Assistance / Construction
development planning, up to and including construction and start up ·
Create and
update fully integrated Engineering, Procurement, & Construction resource
loaded schedules (Utilizing Primavera) ·
Maintained
and developed resources, resource calendars, calendars and other various
tasks within P6 User Fields. ·
Experience
includes, but not limited to field planning, scheduling, cost control,
estimating, & change management in the following areas: Engineering,
Procurement, Construction, Turn-arounds and Start-ups. ·
Industries
worked in include petrochemical, chemical, refinery, gas processing,
pipelines, upstream and downstream facilities. ·
Experienced
in the utilization of Primavera 2.1 to 8.4, Suretrak, Micro Soft Project, SAP
and other sources of software within a Windows environment. ·
Well versed
in working independently or as a team member. Education: Brazosport High School Freeport, TX Brazosport, College Clute, TX Professional Experience: TGE Industrial Services Ascend Materials, Alvin, Texas Planner / Lead SchedulerDec 15 – July 2016 ·
Planned field
jobs per work scope / SAP ·
Developed job
packages ( Plans, P& ID’s, BOM, Scaff, Ins, all aspects of job needs ) ·
Responsible
for scheduling work force throughout pre-post T/A ·
Develop TAR
Schedule - resource loaded (Utilizing Primavera 8.3) ·
Schedule
developed off of field plans ·
Created
Activity Coded Schedule Clifton Planning Sinclair Refinery, Sinclair, Wyoming Lead Scheduler – (TIC $160 MM)Nov
14 – Dec 2015 ·
Responsible
for scheduling work force throughout pre-post T/A ·
Develop TAR
Schedule - resource loaded (Utilizing Primavera 8.3) ·
Schedule
developed off of field plans ·
Created WBS
as well as Activity Coded Schedule ·
Utilized P
and ID’s for reference points of equipment and locations ·
Update and
maintain any and all FCO’s Stapleton InternationalFeb 2014 – Nov
2014
Senior Consultant ·
Import
activities through Excel out of a SAP dump ·
Logically tie
all appropriate activities ·
Ensure all
correct information was imported ( including resources ) ·
Maintained
critical path ·
Reported to
upper management of schedule status’ as per procedures within the TAR ·
Update and
maintain any and all FCO’s Lauren EC Aug 2012 – Feb 2014 Corporate Project Controls Coordinator ·
Maintain
corporate P6 data base. ·
Develop P6
corporate company scheduling procedure. ·
Create and
update fully integrated Engineering, Procurement, & Construction resource
loaded schedules (Utilizing Primavera). Power sector (Solar/Simple
Cycle/Repowering)/Chemical/Process): ·
Enel Green –
New Mexico. ·
Linde
(Several locations). ·
CF Industries
(Donaldsonville, LA). ·
STEC
(Edinburg, Texas). ·
Navajo
Refinery (Artesia, NM). ·
Held weekly
and bi-weekly live schedule update meetings. ·
Loading and
updating of the engineering progress system. ·
Manpower
planning and forecasting. BP America’s – Houston, TX Mar 2012 – Aug
2012 Primavera Administrator ·
Maintain P6
codes and coding structures. ·
Download P6
on North America Gas (NAG) personnel computers. ·
Configured
data bases on (NAG) personnel computers. ·
Developed and
Maintained P6 Procedures. ·
Maintained
and developed resources, resource calendars, calendars and other various
tasks within P6 User Fields. Valero – Houston, TX Oct 2011 – Mar 2012 TAR Scheduler ·
Imported data
base activities into P6. ·
Scheduled
activities within refinery scope. ·
Critiqued and
modified activity resources, calendars and codes. Elkhorn Construction, Inc Jan 2011
– Oct 2011 Planner/Scheduler – COP Pipeline
Maintenance – Small Capital Projects ·
Create and
update fully integrated Engineering, Procurement, & Construction resource
loaded schedules (Utilizing Primavera 6.0). ·
Weekly live
schedule update meetings. ·
Plan/Schedule
Maintenance and Small Capital Projects. ·
Manpower
planning and forecasting. ·
Implementation
and usage of the Management of Change process. ·
Cost tracking
and reporting. ·
Manage all
field activities. ·
Liaison with
Client and Elkhorn. ·
Project
Management roles – responsibilities. ·
Project Bid
Walks and Construction Project Kick Off. Shell Oil and Gas on Shore, North America –
Houston, TXSept 2009 – Jan 2011 Field Scheduler – (TIC $350 MM) ·
Create and
update fully integrated Engineering, Procurement, & Construction resource
loaded schedules (Utilizing Primavera 6.0). ·
Held weekly
and by weekly live schedule update meetings. ·
Managed
Contractor Schedules and Implemented into Master Schedule. ·
Manpower
planning and forecasting. ·
Implementation
and usage of the Management of Change process. ·
Cost tracking
and reporting. ·
Developed
Monthly Project Reports in house and client level. Commonwealth Engineering and Construction Jun
2008 – Sept 2009
Senior Scheduler – Carisal Project (TIC
$200MM) ·
Create and
update fully integrated Engineering, Procurement, & Construction resource
loaded schedules (Utilizing Primavera 3.1). ·
Held weekly
and by weekly live schedule update meetings. ·
Loading and
updating of the engineering progress system. ·
Manpower
planning and forecasting. ·
Implementation
and usage of the Management of Change process. ·
Cost tracking
and reporting. ·
Developed
Monthly Project Reports in house and client level. Commonwealth Engineering and Construction Mar
2007 – Jun 2008
Senior Scheduler – Calumet Project ($250
MM) ·
Review and
validate construction contractor schedules. ·
Created
resource loaded master schedule (Utilizing Primavera 3.1). ·
Cost tracking
and reporting. ·
Field
verifies physical progress per schedule updates. ·
Work with
Project/Area Managers on the execution of scheduled activities. Universal Ensco, Inc. – Engineering Firm,
Gas Pipeline Oct 2005 – Mar 2007 Project Controls Functional Manager - DC
Pipeline Project – Enbridge, Inc. ($265MM) ·
Created
detailed, resource loaded pipeline schedules (Utilizing Primavera 5.0). ·
Maintained
detailed progress within schedules. ·
Monitored all
contractor activities. ·
Cost control
and reporting. ·
Document
controls – Development and Maintenance. ·
Weekly
Progress Reporting at Client level. Solutia, Inc. – Petro-Chem. Jul 2002 – Oct
2005 Turnaround Planner / Scheduler -
Coordinator - 3 – 4 TAR Yearly ($1 – 5MM) ·
Plan / Schedule
all aspects of TAR’s – ·
Field
estimate each individual job, man hour estimate, materials all steps involved ·
Coordinated
all S/D items (Inspection, Engineering and Maintenance). ·
Scheduled and
coordinated all S/D jobs – Purchasing and fabrication logistics. ·
Coordinated
contractors (all crafts) crew sizing and supervision. ·
Created
detailed, resource loaded turnaround schedules (Utilizing Primavera 3.1). ·
Controlled
all aspects of S/D – Implementation – Coordination – Execution –
Finalization. Marathon Ashland Petroleum - Refinery Oct
2001 – Jul 2002 Turnaround Piping Coordinator ·
Coordinate
all piping items (Inspection, Engineering and Maintenance). ·
Schedule and
coordinate pipe jobs – Purchasing and fabrication logistics. ·
Coordinate
contractors – Crew sizing and supervision. ·
Pipe and
materials tracking from drawings to installation. GE Power Systems – Simple Cycle Power Plant
Jun 2000 – Oct 2001 Project Controls Engineer ($265MM)
·
Created
detailed, resource loaded construction schedules (Utilizing Primavera 3.1). ·
Established
and maintained detailed physical progress measurement system. ·
Monitored
subcontractors and approved monthly invoices. ·
Set-up and
maintained Cost Engineering and forecasting utilizing Prolog. ·
Expedited
material deliveries to maintain schedule and cost control. Zachry Const. Corp. – Mobil/Off Gas
Facility Jul 1999 – Jun 2000 Project Controls Representative ($200MM) ·
Responsible
for development of physical progress systems. ·
Developed and
maintained Project Schedules (Utilizing Primavera 2.1). ·
Maintained
time and cost projection. U. S. Contractors – BASF – Petro-Chem. Jan
1984 – Jul 1999 T/A - Planner/Scheduler - 2 – 4 TAR Yearly
($1 – 5MM) ·
Responsible
for scheduling of T/A activities. ·
Created
detailed, resource loaded turnaround schedules (Utilizing Primavera 2.1). ·
Responsible
for T/A implementation. ·
Maintained
time boundaries in productions schedule. ·
Procurement
of all fabrication needs. ·
Planned and
estimated each activity per production job scope. ·
Responsible
for scheduling work force throughout pre-post T/A. ·
Responsible
for coordination of heavy equipment per T/A. ·
Responsible
for each phase of T/A – Development phase through final clean up. ·
Scheduled and
executed equipment repairs and fabrication. ·
Responsible
for employment process – Hiring, screening, training and terminations. ·
Coordinated,
planned and executed all stages of T/A. ·
Coordinated
T/A procedures and operations needs – Pre-Post T/A. ·
Coordinated
outside vendors – Fabrication, scaffolding, insulation, hydro-blasting, etc. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|